What we advise on

Rope access is not always the answer. A swing stage, a lift or scaffold sometimes is, and we will say so.

  1. Access review

    Ropes, swing stage, lift or scaffold compared for each elevation.

    Ropes hanging past a deep overhang on a tower
  2. Anchor check

    What the roof offers today and what an engineer would need to add.

    Ropes rigged from roof anchors across a gravel roof to the building edge
  3. Risk assessment

    Hazards above, below and at the edge, with controls.

    Two technicians climbing over a parapet edge
  4. Method statement

    Sequence, crew size and duration your tender can rely on.

    Technician coiling rope at a roof edge
  5. Budget

    A number early enough to shape the design.

    Residential tower with a swing stage on its facade

Questions

Questions about consultation

Short answers. Call us for the long ones.

Technician on a swing stage high above townhouses, a snow-covered mountain on the horizon

When should we call you?

At design or pre-tender stage. An anchor added to a drawing costs little; an anchor added to a finished roof costs a lot.

What does a site visit involve?

We walk the roof, check the anchors, look over each edge and photograph the elevations. Bring the anchor inspection record if you have one.

Can you review a design for maintainability?

Yes. We look at how a window cleaner or sealant crew will reach each surface in twenty years, and mark what cannot be reached.

Will you price against scaffold?

Yes. We give both figures where both are practical, so the comparison is on your desk.

Access planning on the roof

What a roof offers decides the method: its anchors, its edges and what stands below.

The green copper roof of a downtown Vancouver hotel seen from above Ropes fed through a roof opening with edge protection around them