What we did

Four trades, one crew

Doing the trades in the right order matters: washing first, repairs and sealant before paint, and decks last so nothing is tracked across them.

  • Pressure washing

    The facade washed top to bottom so repairs and primer go onto a clean surface.

  • Exterior painting

    Walls repaired, primed and coated.

  • Traffic coating

    Worn deck membrane removed and a new system applied.

  • Sealant renewal

    Failed exterior joints cut out and resealed.