What we did
Four trades, one crew
Doing the trades in the right order matters: washing first, repairs and sealant before paint, and decks last so nothing is tracked across them.
- Pressure washing
The facade washed top to bottom so repairs and primer go onto a clean surface.
- Exterior painting
Walls repaired, primed and coated.
- Traffic coating
Worn deck membrane removed and a new system applied.
- Sealant renewal
Failed exterior joints cut out and resealed.
From the air
Tower restoration from the air
Shot by drone once the swing stages were down.