Panel and glazing installs
Late panels, replaced spandrels and missed trims usually turn up after the hoist is gone. We lift them on a rope system and fix them with a technician on each side of the piece.
What we install
We work as a subtrade to glazing and cladding contractors, to their shop drawings and fixings.
- Metal panels
Composite and sheet metal panels lifted with a vacuum lifter.
- Spandrel glass
Spandrel units and infill panels replaced from outside.
- Flashings and trims
Head flashings, corner cups and closures at transitions.
- Doors
Sliding and swing door installation on balconies.
- Deficiencies
Punch-list items closed out across a finished façade.
Questions about panel and glazing installation
Short answers. Call us for the long ones.
Can you install to our shop drawings?
Yes. We follow your drawings, fixings and sequence, and your site lead signs off each area.
How do panels get to the façade?
Up the outside on a hauling system, or out through a suite when they fit. Smooth panels ride on a vacuum lifter.
Do you replace broken glass?
We replace spandrel and infill units from the outside. Vision glass is quoted case by case with your glazier.
Will you close out a deficiency list?
Yes. Scattered items across a tall façade are exactly what rope access is quick at.

Panels going on
Two technicians, one piece: one guides the panel while the other fixes it.
